There were five main objectives for the trials cruise: The first tests of the Autosub Long Range AUV, testing of the HyBIS video guided grab system, testing of the MYRTLE-X Lander systems, testing of a deep camera system for the Lake Ellsworth probe and test deployments of the PELAGRA neutrally buoyant sediment capture drifters. The working area was about 300 miles south west of the Canary Islands, in international waters, over benthic plains of 4000 m depth, with some tests of the video systems over a isolated sea mount rising to 1200 m depth. Most of the objectives of the cruise where met, with successful diving and control of the Autosub LR, tests of the HyBIS and Ellsworth camera systems, and 3 test deployments and recoveries of two PELAGRA floats. Several wire tests of MYRTLE-X systems were carried out, predominantly successful, but concerns over the release system prevented a deployment of the lander. The tests were all purely engineering, hence no science data were collected.
This equipment trials cruise has provided opportunities for test and verification of technology under development at the Proudman Oceanographic Laboratory (POL), the Scottish Association for Marine Science (SAMS) and the National Oceanography Centre, Southampton (NOC,S). This includes equipment developed during the first year of funding under OCEANS 2025 (theme 8). Testing technology in the ocean environment is invaluable in assessing fitness for purpose. Specifically, the cruise tested: A Spar wave buoy (NOC,S) biogeochemical sensors (NOC,S); an UAV system (NOC,S); a video grab system "HyBis" (NOC,S), A benthic Multicore (NOC,S), A benthic lander and associated torroidal Telemetry buoy (POL), and a shallow tow towfish (POL). Testing in Spanish waters (near Tenerife, Gran Canaria and Fuerteventura) has been invaluable. The time on passage has been minimised (the transition from deep to shallow water is less than a days steaming) and the calm conditions to the southwest of the islands in the consistent prevailing north easterly winds have enabled deployment and recovery techniques to be tried and optimised in safety.
Estacion Anclade B-I
CANAL IX
Hidrologia de Tunidos I
Hidrologia de Tunidos III
Estacion Anclada A-II
Canal III
Canal IV
Cr. CANAL-VII